Construction Progress Phase IX
|
 |
 |
The first structural bulkhead is infused to be followed by the hanging lockers |
Vacuum bag placed over outside laminate, core and resin materials. The bag needs to be tight to all surfaces |
 |
 |
Inserting resin lines into the vacuum bag |
The resin infusion begins. Each tube supplies resin to a different region of the deck and is opened in sequence to insure proper wetting of the materials. |
 |
 |
|
Successful infusion! |
|
|