Construction Progress Phase VIII
|
 |
 |
Ready for hull plug completion |
|
 |
 |
Completed mold framework |
|
 |
 |
Finished plug and mold moved from the shed |
Preparing to split the mold |
 |
 |
|
|
 |
 |
The port mold is pulled off the plug |
|
 |
 |
The starboard hull mold arrives at Morris Yachts |
|
 |
 |
Installing the inserts for the seacocks in the hull mold halves |
|
 |
 |
Laminating the forward hanging locker as a one-piece unit |
Loading the infusion table with fabric to form the structural keel floors and stringers |
 |
|
Fiberglass ribs to be installed under the bunks to distribute the chainplate loads to the lower stringers |
|
|
|