Construction Progress Phase VI
|
 |
 |
The finished deck mold is flipped off the plug (see in the background) |
|
 |
 |
|
The deck plug is returned to the shop for the construction of the deck splashes (orange area) |
 |
 |
These splashes (panels) will be used as templates for equipment locations on the finished L-44 decks. |
The glossy areas of the deck mold are buffed to produce a high gloss finish |
 |
 |
Cockpit detail |
The hull gets the first cut on the CNC router |
 |
 |
|
|
 |
 |
The hull plug in the final phase of the finish milling |
|
 |
 |
|
|
|
|