Construction Progress Phase I
|
 |
 |
Construction of the support frames for the L-44 deck plug |
|
 |
 |
Injecting the low desity urethane foam into the deck plug |
The CNC (computer numeric control) router begins the shaping of the plug by utilizing the 3-D computer model created by Pedrick Yacht Design. |
 |
 |
The cockpit begins to take shape |
The almost completed plug will become the male component to produce the femaile mold used by Morris Yachts to produce the L-44 deck. |
|
|